← Glossary index

Alphabet archive · T

T glossary entries

T glossary archive with 14 engineering terms across 8 disciplines, linking definitions to canonical Atlas of Engineering branch pages.

device Tachometer

A tachometer is an instrument or sensor system that measures rotational speed of a shaft, rotor, wheel, or rotating machine.

Mechanical Engineering
device Tailings Storage Facility

A tailings storage facility is an engineered system used to contain mine tailings, process water, and associated seepage or closure controls.

Mining and Georesources Engineering
quantity Tensile Strength

Tensile strength is the tensile stress level associated with fracture or with the maximum load carried during a tensile test, depending on the material and reporting convention.

Materials Engineering
metric Thermal Efficiency

Thermal efficiency is the ratio of the net work output of a heat engine or thermodynamic cycle to the heat energy supplied from the hot source, measuring how effectively the cycle converts heat into useful work.

Energy Engineering
phenomenon Thermal Stress

Thermal stress is the internal stress that develops in a body when its thermal expansion or contraction is wholly or partially prevented by external constraints, internal compatibility requirements, or the mismatch in thermal expansion coefficients between bonded dissimilar materials.

Mechanical Engineering
device Thermocouple

A thermocouple is a temperature sensor that uses the Seebeck voltage generated by two dissimilar conductors joined at a measurement junction.

Electronic Engineering
model Thevenin Equivalent

A Thevenin equivalent represents a linear two-terminal network as an ideal voltage source in series with an equivalent impedance.

Electrical Engineering
quantity Thrust

Thrust is the propulsive force produced when a system accelerates mass or exchanges momentum with a surrounding fluid.

Aerospace Engineering
quantity Time Constant

A time constant is the characteristic time scale of a first-order exponential response, indicating how fast a system approaches a new steady state.

Automation and Control Engineering
method Tolerance Stack-Up

Tolerance stack-up is the analysis of how individual part and assembly variations accumulate to affect a critical dimension or functional requirement.

Mechanical Engineering
quantity Torque

Torque is the rotational moment produced by a force acting with a lever arm about an axis, causing rotation, twist, or rotational equilibrium.

Mechanical Engineering
device Transducer

A transducer is a device that converts a physical quantity or form of energy into another signal form, usually for measurement, control, or actuation.

Electronic Engineering
concept Transfer Function

A transfer function is the ratio of the Laplace transform of a system's output to the Laplace transform of its input, assuming zero initial conditions, and provides a complete description of the input–output behaviour of a linear time-invariant system.

Automation and Control Engineering
phenomenon Turbulence

Turbulence is irregular, three-dimensional fluid motion with fluctuating velocity, pressure, vorticity, and enhanced mixing across a wide range of scales.

Mechanical Engineering