← Glossary index

Alphabet archive · L

L glossary entries

L glossary archive with 12 engineering terms across 9 disciplines, linking definitions to canonical Atlas of Engineering branch pages.

phenomenon Laminar Flow

Laminar flow is a fluid-flow regime in which motion occurs in smooth layers with limited cross-stream mixing.

Mechanical Engineering
method Laplace Transform

The Laplace transform converts a time-domain function into a complex-frequency-domain representation, often simplifying differential equations into algebraic equations.

Mathematical Engineering
device Laser Diode

A laser diode is a semiconductor diode that emits coherent light when carrier recombination is amplified by optical feedback and stimulated emission.

Electronic Engineering
metric Latency

Latency is the time delay between an input, request, event, or command and the corresponding response or observable effect.

Computer Engineering
quantity Leakage Current

Leakage current is unintended current that flows through insulating materials, semiconductor junctions, protective paths, or parasitic impedances.

Electrical Engineering
quantity Lift Coefficient

Lift coefficient is a dimensionless measure of lift force normalized by dynamic pressure and reference area.

Aerospace Engineering
method Linear Programming

Linear programming is optimization of a linear objective function over a feasible region defined by linear constraints.

Mathematical Engineering
method Liquid Cooling

Liquid cooling is a thermal management method that removes heat by transferring it into a circulating or contained liquid.

Energy Engineering
quantity Load Factor

A load factor is a multiplier applied to a nominal or characteristic load to produce a design load for strength, stability, or reliability checks.

Civil and Construction Engineering
device Logic Gate

A logic gate is a digital circuit that performs a Boolean operation such as AND, OR, NOT, NAND, NOR, XOR, or XNOR.

Computer Engineering
metric Loss Factor

Loss factor is a dimensionless damping metric that relates energy dissipated per cycle to energy stored in a material or structure.

Materials Engineering
device Low-Pass Filter

A low-pass filter passes signal components below a cutoff frequency and attenuates components above that frequency.

Electronic Engineering