Alphabet archive · N
N glossary entries
N glossary archive with 10 engineering terms across 7 disciplines, linking definitions to canonical Atlas of Engineering branch pages.
A frequency at which a system tends to oscillate when disturbed without continuing excitation.
Mechanical EngineeringThe Navier-Stokes equations are the governing momentum-balance equations for viscous fluid flow, relating acceleration, pressure gradients, viscous stresses, and body forces.
Mathematical EngineeringFeedback that subtracts a portion of output from input to reduce error and stabilize behaviour.
Automation and Control EngineeringA computational model made of connected units whose parameters are trained from data.
Computer EngineeringAn iterative root-finding or optimization method using local derivative information.
Mathematical EngineeringNoise figure measures how much a component, receiver, or network degrades signal-to-noise ratio compared with an ideal noiseless device.
Telecommunications EngineeringInspection methods that evaluate materials or components without impairing future service.
Materials EngineeringThe degree to which a material's fatigue strength is reduced by notches or geometric discontinuities.
Materials EngineeringA dimensionless number comparing convective heat transfer to conductive heat transfer.
Energy EngineeringA Nyquist plot is a complex-plane plot of frequency response used with the Nyquist stability criterion to assess closed-loop stability.
Automation and Control Engineering