ENV · 09 23 entries

Engineering branch

Environmental Engineering

Environmental engineering entries on water systems, wastewater, emissions, stormwater, remediation, waste recovery, permitting, and compliance.

Entries · 23
Topic Air Quality and Emissions Control Systems Environmental guide to air quality and emissions: sources, ventilation, dispersion, gas treatment, monitoring, uncertainty, compliance, and operations. Topic Contaminated Site Remediation and Groundwater Protection Environmental guide to site remediation, groundwater protection, hydrogeology, monitoring, risk pathways, containment, treatment, closure, and validation. Topic Environmental Impact Assessment, Permitting, and Compliance Engineering Environmental guide to impact assessment, permitting, compliance, baseline studies, air, water, waste, stormwater, mitigation, monitoring, uncertainty, and validation. Topic Environmental Water and Wastewater Systems Environmental water guide covering water balances, runoff, pipe hydraulics, pumping, transients, wet-weather overflows, treatment flow, monitoring, and resilience. Topic Solid Waste and Resource Recovery Systems Environmental guide to solid waste and recovery: characterization, collection, recycling, organics, landfills, leachate, gas, emissions, reliability, and validation. Topic Stormwater and Urban Flood Resilience Environmental guide to stormwater and flood resilience: runoff, drainage, detention, green infrastructure, infiltration, overflow routes, monitoring, and uncertainty. Glossary term Air Emissions Pollutants, vapors, particles, gases, odors, or heat released to air from a source, process, activity, or control boundary. Glossary term Contaminant Transport Movement and transformation of contaminants through soil, groundwater, surface water, air, sediments, or engineered systems. Glossary term Environmental Compliance Operational state in which environmental controls, monitoring, evidence, and reporting satisfy applicable requirements and limits. Glossary term Environmental Monitoring Planned measurement of environmental conditions, emissions, discharges, contaminants, or system performance for compliance and engineering control. Glossary term Groundwater Remediation Engineering actions used to contain, remove, transform, or monitor groundwater contamination and protect receptors. Glossary term Infiltration The process by which water enters soil, porous media, or building envelopes from the surface or surrounding environment. Glossary term Pollutant Load Mass of a pollutant carried, generated, discharged, or treated per time, event, area, or system boundary. Glossary term Stormwater Runoff Rainfall or snowmelt that flows over land, roofs, pavements, drainage networks, or channels instead of infiltrating or being stored. Glossary term Wastewater Treatment Engineered physical, chemical, and biological processes used to remove contaminants from wastewater before discharge, reuse, or further handling. Glossary term Water Quality Physical, chemical, biological, and operational condition of water relative to a defined use, discharge, or environmental objective. Formula sheet Environmental Water Systems Formula Sheet Environmental water formulas for water balance, runoff, infiltration, flow, storage, pollutant load, pipe hydraulics, pressure, pumping, and reliability. Exercise set Air Quality and Emissions Control Systems Exercises Worked environmental engineering exercises for air emissions covering stack mass rate, capture flow, removal efficiency, fan power, filter pressure drop, carbon-bed capacity, bypass emissions, monitoring uncertainty, and corrective-action evidence. Exercise set Contaminated Site Remediation and Groundwater Protection Exercises Worked environmental engineering exercises for contaminated sites covering hydraulic gradient, Darcy flow, plume travel time, mass removal, excavation quantity, monitoring trends, vapor intrusion, hydraulic capture, RPN, and closure evidence. Exercise set Environmental Impact Assessment, Permitting, and Compliance Engineering Exercises Worked environmental engineering exercises for impact assessment and compliance covering emissions load, discharge limits, control efficiency, stormwater capacity, monitoring uncertainty, permit averages, waste classification, RPN, and corrective-action closeout. Exercise set Environmental Water and Wastewater Systems Exercises Worked environmental engineering exercises for water balances, wet-weather flow, pipe velocity, pump power, pollutant loading, equalization storage, residence time, outlet control, availability, and monitoring reconciliation. Exercise set Solid Waste and Resource Recovery Systems Exercises Worked environmental engineering exercises for solid waste and resource recovery covering waste characterization, diversion, contamination, collection capacity, leachate storage, landfill gas, energy recovery, reliability, RPN, and validation evidence. Exercise set Stormwater and Urban Flood Resilience Exercises Worked environmental and civil engineering exercises for stormwater runoff, rational-method peak flow, detention storage, infiltration drawdown, pipe hydraulics, flood barriers, pump reliability, pollutant load, freeboard, and RPN.