Content type archive
Exercise sets
Published Atlas of Engineering exercise sets archive with 65 entries across 15 disciplines, organized for browsing by branch.
Organized by discipline
1 Automation and Control Engineering 6 Biomedical Engineering 6 Chemical Engineering 6 Civil and Construction Engineering 1 Electrical Engineering 4 Electronic Engineering 6 Environmental Engineering 6 Industrial and Management Engineering 2 Computer Engineering 2 Mathematical Engineering 6 Materials Engineering 6 Mechanical Engineering 6 Mining and Georesources Engineering 2 Naval and Marine Engineering 5 Energy Engineering
01 entries
Open branch Automation and Control Engineering
06 entries
Open branch Biomedical Engineering
- EXR Biomaterials and Implantable Medical Devices Exercises Worked biomedical engineering exercises for biomaterials and implantable devices covering stiffness, stress shielding, fatigue damage, corrosion penetration, wear volume, coating thickness, sterilization effects, insulation resistance, validation sampling, and lifecycle risk.
- EXR Biomedical Device Design and Biomechanics Exercises Worked biomedical engineering exercises for device design and biomechanics covering axial stress, contact pressure, bending stress, fatigue, fracture screening, corrosion, strain sensing, leakage current, RPN, actuator force, and validation evidence.
- EXR Biomedical Imaging and Diagnostic Systems Exercises Worked biomedical engineering exercises for imaging and diagnostic systems covering CNR, pixel size, dose-noise trade-offs, ultrasound wavelength, latency, detector quantization, optical SNR, diagnostic performance, measurement uncertainty, throughput, and QA drift.
- EXR Biomedical Signal Acquisition and Instrumentation Exercises Worked biomedical engineering exercises for signal acquisition and instrumentation covering SNR, amplifier gain, ADC resolution, sampling, Wheatstone bridges, filtering, uncertainty budgets, leakage current, latency, photodiode front ends, and data integrity.
- EXR Clinical Engineering and Healthcare Technology Management Exercises Worked biomedical engineering exercises for clinical engineering and healthcare technology management covering acceptance readiness, maintenance capacity, availability, downtime planning, electrical safety screening, recall closure, network load, incident evidence, replacement decisions, and change release.
- EXR Medical Device Verification, Validation, and Risk Management Exercises Worked biomedical engineering exercises for medical device V&V and risk management covering traceability, RPN, measurement uncertainty, usability validation, leakage current, latency, sterilization process evidence, reliability, sampling, and change impact.
06 entries
Open branch Chemical Engineering
- EXR Chemical Process Balances and Reactors Exercises Worked chemical engineering exercises for process balances and reactors covering total mass balance, component conversion, recycle purge, CSTR and PFR conversion, sensible heat duty, reaction heat removal, heat-exchanger area, Reynolds number, and reactor safety risk ranking.
- EXR Chemical Process Control and Plant Operations Exercises Worked chemical engineering exercises for process control and plant operations covering mass-balance closure, flow measurement, residence time, first-order dynamics, alarm response margin, proportional control action, feedforward cooling, analyzer validation, interlock availability, and operating-risk ranking.
- EXR Chemical Process Design, Scale-Up, and Commissioning Exercises Worked chemical engineering exercises for process design, scale-up, and commissioning covering scale factor, area-to-volume change, pilot conversion, reactor sizing, utility load, flushing volume, critical path, punch-list readiness, material-balance acceptance, and scale-up risk ranking.
- EXR Chemical Process Heat Transfer and Utility Systems Exercises Worked chemical engineering exercises for process heat transfer and utility systems covering heat duty, LMTD, cooling water flow, steam consumption, fouling impact, heat flux, Reynolds and Nusselt numbers, utility header capacity, heat recovery, and abnormal-condition risk ranking.
- EXR Chemical Process Safety and Hazard Control Exercises Worked chemical engineering exercises for process safety and hazard control covering adiabatic temperature rise, safe hold time, blocked-in liquid expansion, relief capacity margin, secondary containment, corrosion remaining life, LOPA frequency, proof-test interval, bypass exposure, and incompatible-transfer risk ranking.
- EXR Separation Processes and Distillation Engineering Exercises Worked chemical engineering exercises for separation processes and distillation covering binary distillation balances, component recovery, reflux flow, reboiler duty, absorption removal, extraction balance, membrane concentration, filtration flux, dryer solvent removal, and off-spec risk ranking.
06 entries
Open branch Civil and Construction Engineering
- EXR Beam Deflection Exercises Structural analysis exercises for beam deflection covering simply supported beams, cantilevers, superposition, slope, serviceability limits, and stiffness interpretation.
- EXR Civil Infrastructure Asset Management, Inspection, and Rehabilitation Exercises Worked civil engineering exercises for infrastructure asset records, corrosion loss, load restrictions, monitoring trends, NDT sampling, fatigue exposure, risk ranking, rehabilitation value, and post-repair acceptance.
- EXR Construction Planning and Site Operations Exercises Worked civil construction exercises for work-package readiness, critical path, look-ahead planning, site logistics, temporary loads, quality controls, RPN, MTBF, and handover validation.
- EXR Geotechnical Retaining Structures and Excavation Support Exercises Worked civil engineering exercises for retaining walls and excavation support covering earth pressure, groundwater, surcharge, sliding, overturning, bearing, bracing, drainage, and monitoring triggers.
- EXR Reinforced Concrete and Structural Material Design Exercises Worked civil engineering exercises for reinforced concrete and structural materials covering compression stress, reinforcement area, steel stress, shear screening, punching shear, cover, construction strength, and durability evidence.
- EXR Structural Loads and Beam Analysis Exercises Worked civil engineering exercises for structural loads and beam analysis covering tributary loads, reactions, shear, bending moment, bending stress, serviceability, bearing, and equilibrium checks.
01 entries
Open branch Electrical Engineering
04 entries
Open branch Electronic Engineering
- EXR Digital Hardware, FPGA Design, and Timing Verification Exercises Worked electronic engineering exercises for digital hardware and FPGA design covering clock period, setup slack, hold margin, throughput, latency, FIFO depth, jitter budget, dynamic power, I/O timing, reset synchronization, RPN, and bitstream release evidence.
- EXR Mixed-Signal Electronic Systems and EMC Validation Exercises Worked electronic engineering exercises for mixed-signal systems and EMC validation covering error budgets, SNR, ADC quantization, sampling margin, aliasing, jitter, PDN droop, filter cutoff, common-mode current, thermal rise, RPN, and validation evidence.
- EXR PCB Design, Power Integrity, and Signal Integrity Exercises Worked electronic engineering exercises for PCB design, power integrity, and signal integrity covering transmission-line screening, PDN target impedance, decoupling resonance, via inductance, voltage drop, loop area, trace heating, junction temperature, skew, measurement error, and release evidence.
- EXR Power and Sensor Interface Electronics Exercises Worked electronic engineering exercises for power and sensor interfaces covering linear regulator loss, flyback energy, H-bridge conduction loss, shunt sensing, photodiode current, transimpedance gain, thermocouple voltage, op-amp gain, RC filters, ADC scaling, junction temperature, and validation evidence.
06 entries
Open branch Environmental Engineering
- EXR Air Quality and Emissions Control Systems Exercises Worked environmental engineering exercises for air emissions covering stack mass rate, capture flow, removal efficiency, fan power, filter pressure drop, carbon-bed capacity, bypass emissions, monitoring uncertainty, and corrective-action evidence.
- EXR Contaminated Site Remediation and Groundwater Protection Exercises Worked environmental engineering exercises for contaminated sites covering hydraulic gradient, Darcy flow, plume travel time, mass removal, excavation quantity, monitoring trends, vapor intrusion, hydraulic capture, RPN, and closure evidence.
- EXR Environmental Impact Assessment, Permitting, and Compliance Engineering Exercises Worked environmental engineering exercises for impact assessment and compliance covering emissions load, discharge limits, control efficiency, stormwater capacity, monitoring uncertainty, permit averages, waste classification, RPN, and corrective-action closeout.
- EXR Environmental Water and Wastewater Systems Exercises Worked environmental engineering exercises for water balances, wet-weather flow, pipe velocity, pump power, pollutant loading, equalization storage, residence time, outlet control, availability, and monitoring reconciliation.
- EXR Solid Waste and Resource Recovery Systems Exercises Worked environmental engineering exercises for solid waste and resource recovery covering waste characterization, diversion, contamination, collection capacity, leachate storage, landfill gas, energy recovery, reliability, RPN, and validation evidence.
- EXR Stormwater and Urban Flood Resilience Exercises Worked environmental and civil engineering exercises for stormwater runoff, rational-method peak flow, detention storage, infiltration drawdown, pipe hydraulics, flood barriers, pump reliability, pollutant load, freeboard, and RPN.
06 entries
Open branch Industrial and Management Engineering
- EXR Engineering Economics and Decision Analysis Exercises Worked industrial engineering exercises for engineering economics covering lifecycle cost, present value, payback, downtime cost, schedule delay, bottleneck value, sensitivity thresholds, staged decisions, Pareto trade-offs, benefit tracking, and validation.
- EXR Human Factors and Usability Engineering Exercises Worked industrial engineering exercises for human factors and usability engineering covering takt pressure, alarm response, use-error escapes, workload balance, validation criteria, RPN reduction, interruptions, ergonomic screening, training decay, and post-change drift.
- EXR Operations Planning and Reliability Engineering Exercises Worked industrial engineering exercises for operations planning and reliability covering critical path, Little's Law, takt time, effective capacity, OEE, RPN, MTBF, MTTR, availability, redundancy, Weibull reliability, spare reorder point, and validation.
- EXR Production Systems and Supply Chain Operations Exercises Worked industrial engineering exercises for production systems and supply chains covering takt time, bottlenecks, Little's Law, EOQ, reorder point, unit loads, supplier lead time, rolled throughput yield, on-time delivery, disruption stockout, and validation.
- EXR Quality Engineering and Process Improvement Exercises Worked industrial engineering exercises for quality engineering covering metrology guard bands, process capability, z-scores, Gage R&R, sampling decisions, FMEA RPN, CAPA recurrence, Pareto defect analysis, validation sample size, and evidence-based improvement.
- EXR Systems Engineering Requirements and Lifecycle Management Exercises Worked systems engineering exercises for requirements, traceability, interface acceptance, verification coverage, change impact, reliability allocation, requirements debt, lifecycle cost, handover readiness, and operational feedback.
02 entries
Open branch Computer Engineering
- EXR Cache, Memory, and Performance Exercises Worked computer engineering exercises for cache behavior, memory footprint, average memory access time, locality, bus bandwidth, transfer time, queue utilization, Amdahl speedup, tail latency, and performance-validation evidence.
- EXR Digital Logic and Timing Analysis Exercises Worked computer engineering exercises for digital logic and embedded timing, covering Boolean simplification, propagation delay, setup and hold checks, synchronizers, bus throughput, buffers, sampling, quantization, jitter, interrupt load, timers, PWM, and release evidence.
02 entries
Open branch Mathematical Engineering
- EXR Data Assimilation and Digital Twin Exercises Worked mathematical engineering exercises for data assimilation and digital twins covering residuals, sensor fusion, Kalman updates, uncertainty propagation, sampling, validation metrics, and drift.
- EXR State Estimation and Sensor Fusion Exercises Worked mathematical engineering exercises for state estimation and sensor fusion covering state-space prediction, Kalman updates, covariance propagation, inverse-variance fusion, innovation gating, observability, EKF linearization, and validation.
06 entries
Open branch Materials Engineering
- EXR Corrosion and Surface Protection Engineering Exercises Worked materials engineering exercises for corrosion and surface protection covering wall loss, corrosion allowance, galvanic area ratio, coating thickness, zinc consumption, cathodic protection current, oxidation growth, pit severity, inspection coverage, lifecycle cost, and validation evidence.
- EXR Material Fatigue and Fracture Exercises Worked materials engineering exercises for fatigue and fracture covering stress amplitude, stress ratio, Goodman screening, Miner damage, notch fatigue, critical crack size, crack-growth inspection intervals, corrosion-fatigue, residual strength, and validation evidence.
- EXR Materials Characterization, Testing, and NDE Exercises Worked materials engineering exercises for characterization, testing, and non-destructive evaluation covering tensile properties, modulus, hardness maps, CT resolution, ultrasonic thickness, XRD, XRF screening, defect margins, measurement uncertainty, sampling, and validation evidence.
- EXR Materials Processing and Manufacturing Routes Exercises Worked materials engineering exercises for processing and manufacturing routes covering material yield, forming strain, heat-treatment acceptance, welding heat input, sintering shrinkage, additive anisotropy, CT porosity, coating thickness, process capability, rheology, repair limits, and validation evidence.
- EXR Materials Selection and Mechanical Properties Exercises Worked materials engineering exercises for materials selection and mechanical properties covering specific stiffness, allowable stress, shear modulus, ductility, hardness screening, anisotropy, thermal stress, fatigue relevance, corrosion allowance, inspection evidence, and lifecycle trade-offs.
- EXR Polymer, Composite, and Ceramic Materials Engineering Exercises Worked materials engineering exercises for polymers, composites, and ceramics covering rule of mixtures, fiber volume fraction, anisotropy, laminate balance, adhesive shear, moisture uptake, creep strain, void content, thermal stress, ceramic fracture, proof screening, and validation evidence.
06 entries
Open branch Mechanical Engineering
- EXR Heat Sink and Forced Convection Sizing Exercises Worked mechanical engineering exercises for heat sink and forced convection sizing, covering thermal resistance targets, airflow, convection coefficients, fin area, coolant flow, pressure drop, fan power, derating, and validation.
- EXR Machine Design and Power Transmission Systems Exercises Worked mechanical engineering exercises for machine design covering torque, speed, gear ratio, shaft sizing, keyway stress, bearing life, resonance separation, reflected inertia, tolerance stack-up, fatigue damage, hoist brake torque, and validation.
- EXR Mechanical Fluid Flow and Piping Systems Exercises Worked mechanical engineering exercises for fluid flow and piping covering continuity, Reynolds number, pressure loss, pump power, NPSH margin, valve pressure drop, flow-meter inference, water hammer, branch balancing, and validation.
- EXR Mechanical Stress Analysis Exercises Worked mechanical engineering exercises for stress analysis covering axial stress, bending, torsion, von Mises stress, stress concentration, deflection, buckling, thermal stress, fatigue, pressure loads, and strain-gauge validation.
- EXR Mechanical Vibration and Rotating Machinery Reliability Exercises Worked mechanical engineering exercises for vibration and rotating machinery covering forcing frequencies, resonance separation, damping ratio, unbalance force, isolation transmissibility, speed avoidance, gear mesh frequency, sampling, fatigue damage, RPN, and validation.
- EXR Thermal Management and Heat Transfer Exercises Worked mechanical engineering exercises for thermal management covering heat duty, thermal resistance, junction temperature, convection, coolant flow, heat exchangers, heat flux, and validation.
06 entries
Open branch Mining and Georesources Engineering
- EXR Mine Dewatering and Groundwater Control Systems Exercises Worked mining engineering exercises for mine dewatering covering inflow balance, sump storage time, pump power, pipeline velocity, Reynolds number, hydrostatic pressure, storm storage, availability, monitoring residuals, and trigger response.
- EXR Mine Planning, Production Scheduling, and Georesource Risk Exercises Worked mining engineering exercises for mine planning and georesource risk covering cutoff grade, block value, stockpile balance, truck fleet capacity, crusher utilization, critical path, blending grade, NPV, Monte Carlo risk, reconciliation variance, and replanning triggers.
- EXR Mine Slope Stability and Excavation Design Exercises Worked mining engineering exercises for mine slope stability and excavation design covering overall slope angle, bench geometry, hydrostatic pressure, effective stress, planar sliding, monitoring rates, catch berm capacity, haul-road grade, support demand, and geotechnical risk ranking.
- EXR Mine Ventilation and Underground Safety Systems Exercises Worked mining engineering exercises for underground mine ventilation and safety covering airflow, contaminant dilution, pressure loss, fan power, Venturi flow measurement, Reynolds number, heat load, post-blast clearance, reliability, and interlock risk ranking.
- EXR Mineral Processing and Ore Handling Systems Exercises Worked mining engineering exercises for mineral processing and ore handling covering ore grade, metal recovery, mass balance, slurry flow, conveyor capacity, screen efficiency, circulating load, pumping power, thickener water balance, metallurgical reconciliation, and failure-mode risk.
- EXR Tailings, Mine Waste, and Closure Engineering Exercises Worked mining engineering exercises for tailings and mine closure covering solids balance, storage volume, pond water balance, seepage, freeboard, slurry density, closure cover material, monitoring trends, RPN, and handover evidence.
05 entries
Open branch Energy Engineering
- EXR Data Center Power and Cooling Exercises Worked engineering exercises for data center power and cooling covering IT heat load, PUE, airflow, liquid-cooling flow, UPS autonomy, redundancy, and commissioning evidence.
- EXR Energy Storage and Grid Flexibility Exercises Worked engineering exercises for energy storage and grid flexibility covering usable energy, SOC reserve, duration, peak shaving, renewable shifting, round-trip efficiency, inverter loading, and validation.
- EXR Energy Storage Dispatch and Round-Trip Efficiency Exercises Worked engineering exercises for energy storage dispatch, AC and DC energy boundaries, SOC trajectory, reserve protection, round-trip efficiency, arbitrage, recharge, and acceptance testing.
- EXR Generator Grid Connection and Fault Level Exercises Worked engineering exercises for generator grid connection and fault level screening, covering three-phase current, transformer impedance, short-circuit MVA, breaker duty, inverter SCR, reactive capability, voltage rise, and protection evidence.
- EXR Power Generation and Grid Integration Exercises Worked engineering exercises for power generation and grid integration covering net efficiency, capacity factor, export limits, apparent power, ramp rate, reserve, three-phase current, curtailment, and validation.