Content type archive
Biographies
Published Atlas of Engineering biographies archive with 3 entries across 2 disciplines, organized for browsing by branch.
Organized by discipline
01 entries
Open branch Mathematical Engineering
02 entries
Open branch Telecommunications Engineering
- BIO Claude Shannon Technical biography of Claude Shannon covering switching theory, information theory, entropy, channel capacity, coding, noise, digital circuits, secrecy systems, and reliable communication.
- BIO Hedy Lamarr Technical biography of Hedy Lamarr covering frequency hopping, secure radio control, anti-jamming communication, synchronization, spread-spectrum concepts, patent constraints, and wireless engineering legacy.