← Content types on home
PRJ · Project 009 entries Updated Jun 20, 2026

Content type archive

Projects

Published Atlas of Engineering projects archive with 9 entries across 7 disciplines, organized for browsing by branch.

Organized by discipline
01 entries

Automation and Control Engineering

Open branch
  1. PRJ PID-Controlled DC Motor Speed Project A practical engineering project for designing, modelling, implementing, tuning, and validating a PID speed-control loop for a brushed DC motor with encoder feedback.
01 entries

Electronic Engineering

Open branch
  1. PRJ Strain Gauge Load Cell Project Engineering project for designing, calibrating, and validating a strain gauge load cell measurement system with bridge excitation, signal conditioning, uncertainty analysis, and acceptance testing.
01 entries

Computer Engineering

Open branch
  1. PRJ Microcontroller Data Acquisition Project Computer engineering project for designing and validating a microcontroller data-acquisition system, including sensor channels, sampling rates, ADC scaling, anti-alias filtering, buffer sizing, firmware timing, calibration, diagnostics, and validation evidence.
01 entries

Mathematical Engineering

Open branch
  1. PRJ Heat Exchanger Digital Twin Project Mathematical engineering project for building a simple heat exchanger digital twin using energy balances, sensor data, UA estimation, residuals, uncertainty, and validation.
01 entries

Mechanical Engineering

Open branch
  1. PRJ Electronics Thermal Management Project Engineering project for designing and validating the thermal management of an electronics assembly, including power loss, junction temperature, PCB heat spreading, heat sink selection, airflow, derating, instrumentation, and test evidence.
03 entries

Energy Engineering

Open branch
  1. PRJ Data Center Cooling Load Estimation Project Energy engineering project for estimating data center cooling load from IT power, rack density, airflow, liquid cooling flow, auxiliary loads, redundancy, and validation evidence.
  2. PRJ Microgrid Battery Dispatch Project Energy engineering project for designing and validating a microgrid battery dispatch policy with critical loads, PV support, SOC reserve, islanded operation, recharge, protection limits, and test evidence.
  3. PRJ Solar PV Sizing Project Energy engineering project for sizing a solar photovoltaic system with load profiles, resource assessment, array capacity, inverter sizing, storage, grid connection, losses, economics, risks, and validation.